| Work Type | Cost |
|---|---|
| A permit to construct, rehabilitate, or destroy wells including Water Supply Wells, Cathodic Protection/Anode Wells, Water Monitoring Wells, Piezometer/Inclinometer/Seismic Monitoring Wells, Geothermal Heat Pump-Construction. | $397.00 per well |
A permit to bore exploratory holes for Contamination Study |
$265 per site * |
| A permit to bore exploratory holes for Environmental Study | $265 per site * |
| A permit to bore exploratory holes for Geotechnical Study | $265 per site * |
A permit for construction and destruction of any types of remediation systems, including vapor probes/vapor points for sampling, vapor injection/extraction boreholes or remediation wells, sparge wells, recharge wells |
$265 per site * |
A permit for construction and destruction of vapor monitoring wells |
$265 per site * |
| * A site includes the project parcel as well as any adjoining parcels as long as it is the same property owner. | |
Permit Fees are exempt for State & Federal Projects.
Applicants shall submit a letter from the agency requesting the fee exemption.